Value: 4,181,181.18 USD

    Location: Mmamashia – Kanye, Botswana 2015

    Client: Department of Water Affairs

    Consultants: Engineers International

    Main contractors: BSZ Joint Venture

    Scope of work covered:
    This contract involves Mechanical & Automation supply, installation, testing & commissioning works for the following pump stations which has total quantity of 19 no’s of various capacity of pumps:

    • Mmamashia pump station.
    • Mononyane pump station.
    • Thamaga pump station.
    • Polokwe pump station.
    • Sejelo pump station.

    The project also included:

    • Installation of Pipeworks.
    • Valves (PN 25).
    • Control Valves.
    • Switchgear.
    • Fibre Optic / Microwave link communication.
    • SCADA system.
    • Instrumentation.
    • Air conditioning.
    • Ventilation.
    • Extraction & Fire Fighting system.

    Value: 6,754,807.92 USD

    Location: Mahalapye Village, Botswana, ongoing.

    Client: Waters Utilities Corporation.

    Consultants: Bergstan Gauff.

    Main Contractor: Zhong Gan Engeneering and Construction.

    Scope of work covered:
    This contract involves the installation, testing and commissioning of the following:

    • Water pipelines of bulk supply & reticulation for 250 km (Upvc, class PN 9 & Ductile Iron) ranging in size from 63 mm diameter to 900 mm diameter.
    • Plot connections.
    • Supply & installation of Butterfly Isolation Valves (Ozkan Make). Gate Valves & Air release Valves.
    • Relocation of services.
    Dikgatlong-Dam-projec2t
    Project details

    Value: 17,179,487.17 USD

    Location: Robelela Village, Botswana 2015

    Client: Department of Water Affairs

    Consultants: Bergstan Gauff – Jeffares & Green (Joint Venture)

    Scope of work covered:

      • Electrical and mechanical plant covering design.
      • Supply, delivery, installation, testing and commissioning of pump station for Dikgatlhong Dam Project.
      • Design, supply, delivery, installation and testing of mechanical, electrical & automation services for pumps/motors three no’s with variable speed drives to deliver a flow of 2126 l/s at 183m head within the pump station.
      • Installation of:
        • Pipe works.
        • Valves (PN 25).
        • Control valves.
        • Surge vessels (30m 3 x 4 no’s).
        • Electrical transformers (LV & MV),
        • Switchgear.
        • Fibre optic / microwave link communication (primary & secondary),
        • SCADA system.
        • Instrumentation.
        • Air conditioning & ventilation.
        • Extraction & fire fighting system (fire hose reel & sprinkler).
    Vereeneging-Butterfly-Valve2
    Vereeneging
    Palapye
    Mechanical & Solar
    4, 871,794.87 USD
    2012
    Project details

    Client: Randwater

    Scope of work covered:

    • Modification of 1800mm and 2500mm dia Penstock gate valves.
    • Refurbishment and upgrade of 1400mm, 1600mm, 2500mm
    • Butterfly valves and supply, installation and commissioning of 900mm
      metal sealing butterfly valves.
    Upgrade-of-Booster-pumps-at-Zwartkopjes-Pump-Station

    Value: $ 6,112,781.00 USD

    Location: Vereeniging, Gauteng, South Africa, 2010

    Client: Randwater

    Scope of work covered:
    This contract is for the design, supply, delivery, installation, and testing at site of:

    • Five 100ml/d fixed speed electric-motor-driven
      pump sets.
    • 400v switchgear modifications ,cabling and cable joints.
    • Instrumentation and other associated cabling and cable racking.
    Project details

    Value: 4,860,000.00 USD

    Location: Serowe, Botswana, 2006.

    Client: Department of Water Supplies.

    Consultants: Geoflux.

    Scope of work covered:

    • Construction of 30,000 meters of 315 mm diameter UPVC pumping Mains.
    • Construction of 3,500 meters of 300 mm diameter Galvanized Mild steel pumping Mains.
    • Construction of 1,600 meters of Gravity Mains.
    • Construction of 5,000,000 liters capacity Ground level reinforced concrete reservoir.
    • Design, Installation, Testing & Commissioning of 7 existing and 9 new borehole pumping stations.
    • Design & Construction of 2 nos. booster pumping stations.
    • Design, installation, testing and commissioning or telemetry and SCADA system.