Value: 17,179,487.17 USD
Location: Robelela Village, Botswana 2015
Client: Department of Water Affairs
Consultants: Bergstan Gauff – Jeffares & Green (Joint Venture)
Scope of work covered:
-
- Electrical and mechanical plant covering design.
- Supply, delivery, installation, testing and commissioning of pump station for Dikgatlhong Dam Project.
- Design, supply, delivery, installation and testing of mechanical, electrical & automation services for pumps/motors three no’s with variable speed drives to deliver a flow of 2126 l/s at 183m head within the pump station.
- Installation of:
- Pipe works.
- Valves (PN 25).
- Control valves.
- Surge vessels (30m 3 x 4 no’s).
- Electrical transformers (LV & MV),
- Switchgear.
- Fibre optic / microwave link communication (primary & secondary),
- SCADA system.
- Instrumentation.
- Air conditioning & ventilation.
- Extraction & fire fighting system (fire hose reel & sprinkler).