Value: 8, 535,212 USD
Location: Lobatse, Botswana, 2009
Main Contractor: China Civil Engineering Construction (Botswana)
Project Manager: Pinagare Architects
Consultant: G4 Consulting Engineers
Client: Ministry of Infrastructure, Science and Technology
Scope of work covered:
- Buildings
- Acute.
- Observation,
- Psycho-Geriatric & Psycho-Social.
- Children’s ward.
- Forensic ward.
- Rehabilitation.
- Outpatient and Occupational Therapy Wards.
- Administration.
- Day Hospital.
- Pharmacy.
- Laboratories.
- Library, Café and Kitchen & Laundry.Incinerator, Boiler House, Supplies and Transport Buildings.
- There are 22 plant rooms in this project housing equipment such as:
- 3 No. Air Cooled Liquid Chillers.
- 6 No. Thermal Storage Units.
- 1 No. Diesel Fired Boiler.
- 2 No. Coal Fired Boilers.
- Non-storage and storage Calorifiers.
- Fire Pumps, Sprinkler Pumps & Chiller Pumps.
- Air Handling Units, Air Compressors, Cold and Freezer Rooms.
- Laundry Equipment The 3 Air Cooled Liquid Chillers run during the nights making ice in the Thermal Storage Units using Ethylene Glycol as heat transfer liquid.