Project details

Value: 2, 029,624 USD

Location: Gaborone, Botswana, 2010

Client: Department of Building and Engineering Services

Consultant: ZMCK Consulting (Pty) Ltd.

Main Contractor: Complant Botswana, Gaborone, Botswana

Project Manager: Conscom, Gaborone, Botswana

Scope of work covered:

  • HVAC.
    • 1 x 443 kW Chiller.
    • 1×7.5kW water circulation pump set.
    • 23 Air Handling Units
    • 60 Hydronic Cassettes and the related chilled water piping to AHUs & HC,
    • Packaged Units,
    • DX-Split Units High Wall & Cassettes,
    • Extract fans, Extract Canopies, Hot water supply from Storage Calorifiers, Cold & Freezer Rooms
    • LPG and Laboratory Fume cabinets.
  • Kitchen Equipment.
  • Laboratory Equipment and LPG Services for the extension on the Gaborone Technical College and Automotive Technical Trade College by 7 & 2 Buildings respectively.
  • Commissioning and Training of the end User.